Snow Brake Placement
This image shows the the typical snow brake and snow guard placement on a standing seam metal roof. The first row is approximately 15" from the eave, the second and third are each 15" above the preceding row. For extra protection in climates with severe snowfall, three rows may be placed at the top of the roof slope, starting 15" below the ridge. Check the images below for further assistance.

 
|